803 Industrial Park: Gateway One
Edmund Highway & Trade Zone Road, West Columbia, SC, 29170Property Details
County: Lexington Available SF: 140,400 Total SF: 252,720 Sales Price Per Acre: $7.00 Lease Price Per SF: $0.00 - $0.00
Details
- Property Type: Industrial Building
- Lease Price Description: Call for Pricing. Price depends on improvements
- Community: 803 Industrial Park
- Lat/Long: 33.94137/-81.0979
- Date Available: 02-14-2025
- Tax Map ID: 006797-01-006
Physical Characteristics
- Minimum Divisible SF: 56
- Number of Floors: 1
- First Floor SF: 252720
- Zoning: Industrial
- Nearby Land Use: Industrial, Commercial
Special or Structural Features
- Year Built: 2023
- Clear Height at Center: 32'
- Column Spacing: 54' x 50'
- Roof: 45mil white TPO roof
- Walls: Tilt-up concrete wall panels, external gutters & down-spouts
- Floors: 6" non-reinforced sealed concrete
- Parking: 208 parking spots
- Lighting: LED motion-controlled high-bay lights
- Truck Loading: 9 dock-high doors (expandable tp 27)
- Additional Information: Multimodal hub adjacent to CAE, UPS air & ground hubs, FedEx Freight & Norfolk Southern transload
Climate Control and Safety
- Heat System: Unit heaters for freeze protection
- Sprinkler Type: ESFR fire protection with fire pump
- Sprinkler Coverage: 100%
- On Site Amenities: Located at the end of the CAE airport runway
- Former Commercial Property Use: New speculative construction
Transportation
- Airport Distances: Columbia Metropolitan Airport: adjacent; Charlotte International Airport: 105 miles; Charleston International Airport: 105 miles
- Highway Distance: I-26: 1 mile; I-77: 3.2 miles; I-20: 5.6 miles
- Port Distance: Port of Charleston: 115 miles
Utilities
Electric
- Supplier: Dominion Energy
- Supply: 2,000 amp service, 480/277v 3-phase
Natural Gas
- Supplier: Dominion Energy
Water
- Supplier: City of Cayce
- Size of Main: 8
- Distance of Main: On-Site
- Treatment Capacity: 9.6 MGD
- Average Demand: 5.4 MGD
Waste Water
- Supplier: City of Cayce
- Size of Main: 12"
- Distance of Main: On-Site
- Treatment Capacity: 25 MGD
- Average Demand: 5.5 MGD
Telecom
- Supplier: AT&T, Spectrum
- Service Description: Voice, internet, cable
Fire Protection
- Supplier: City of Cayce