Clarendon County Spec Building #8
2414 Jo Rogers Blvd., Manning, SC, 29104Property Details
County: Clarendon Available SF: 50,000 Total SF: 50,000 Sales Price: $4,500,000.00 Lease Price Per SF: $5.00
Details
- Property Type: Industrial Building
- Lease Terms: NNN
- Community: Clarendon County Industrial Park
- Lat/Long: 33.639704/-80.262909
- Date Available: 10-01-2022
- Tax Map ID: 141-00-02-025-00, 141-00-02-046-00, 141-00-02-056-00
Physical Characteristics
- Number of Floors: 1
- First Floor SF: 50000
- Other SF: Expandable to 150,000
- Acres: 15.00
- Nearby Land Use: Industrial & Agricultural
Special or Structural Features
- Industrial Park Tenants: Alucoil North America; Meritor; Trimaco; Powell Valves; Swift Green Filters; AMGO; Advanta; Select Laboratories; On Time Distribution; Sumter Casket Company; Loctek
- Year Built: 2022
- Condition: Excellent
- Clear Height at Center: 39'
- Clear Height at Eaves: 32'
- Roof: TPO (45-60 mil to be determined)
- Walls: Precast insulated concrete
- Floors: 6" slab with #4 rebar, 16" EW 4,000 PSI concrete
- Parking: To Suit; during construction 4-5 parking spaces to be constructed
- Lighting: LED lighting throughout; two (2) exterior lights on front of building
- Truck Loading: 1 Drive in Door (20' x 20'), 15 knock out panels for dock doors (14' X 16')
- Additional Information: Brand new speculative construction delivering Q1 2023
Climate Control and Safety
- Air Conditioning: Mechanically operated ventilation system on timers
- Heat System: Mechanically operated ventilation system on timers
- Sprinkler Type: To Suit
- On Site Amenities: Clearstory windows on North & West walls to allow for natural lighting
- Former Commercial Property Use: Brand new speculative construction
- On Site Management : Security system to be installed
Transportation
- Airport Distances: Columbia Metro: 73.1 miles; Charleston International: 77.7 miles; Charlotte International: 145 miles
- Highway Distance: I-95: 1.5 miles
- Railroad Distances: CSX: 5.4 miles
- Port Distance: Port of Charleston: 85.4 miles
Utilities
Electric
- Supplier: Santee Electric Cooperative
Natural Gas
- Supplier: Dominion Energy
- Size of Main: 4"
Water
- Supplier: City of Manning
- Size of Main: 16"
- Treatment Capacity: 3.2 MGD
- Average Demand: 1.48 MGD
Waste Water
- Supplier: City of Manning
- Size of Main: 10"
- Treatment Capacity: 2.5 MGD
- Average Demand: 1.2 MGD
- Force of Gravity: Gravity
Telecom
- Supplier: FTC
- Service Description: Fiber led loop
Fire Protection
- Supplier: Clarendon County Fire
- Fire Insurance Rating: 5
