• County Lines
  • Railroad Lines

  • Major Cities
  • Attractions
  • Schools
  • Major Employers
  • Airports
  • Seaports

Downloads

Maps

Property Information

Due Diligence

Labor Draw Maps & Reports


Downloads

Downloads

Maps

Property Information

Due Diligence

Labor Draw Maps & Reports


Back to Search   

Hide Property Map

Property Details

Enterprise Campus at Midlands Tech

County or City: City of Columbia

Property Type: Site / Park

Address: 151 Powell Road, Columbia, SC 29203

Add to Quick Compare (0)
(clear)(view)

 Add to Favorites (0)
(clear)(view)

Site/Park Details


Total Acres: 130.00
Acres Available: 100.00
Min/Max Sale Price per Acre: $30,000.00 / $55,000.00
Date Available: 09/08/2011
Tax Map ID: R14500-02-42
Lat/Long: 34.10207 / -80.97995

Physical Characteristics

Sub-dividable Acres: 100.00
Minimum Acres: 5.00
Additional Contiguous Acres: 0.00
Site Shape: Irregular
Site Dimensions: Not Determined
Topography Description: Mostly Level to Gently Sloping
Elevation Minimum: 290
Elevation Maximum: 390
Soil Type: Loam, Silt Loam
Zoning: M-1
Special Features
Restrictive Covenants: No
Due Diligence Performed: Phase I Environment,Geotechnical Exploration,Wetlands Determination,Wetlands Delineation,Protected Species Assessment,Cultural Resources Reconnaissance Survey
Multiple Tenants: Yes
Current Tenants: The Ritedose Corp, DPX Technologies, GreenWay Group, JB’s Proof, Micro Vapor Devices

Transportation

Airport Distance: Columbia Metro: 17 miles; Charlotte International: 87.3 miles
Highway Distance: I-77: 2 miles; I-20: 2.5 miles
Port Distances: Port of Charleston: 126 miles

Utilities

Electric
Supplier: Dominion Energy
Supply: Sub Station on Site
Backup Generator: No

Natural Gas
Supplier: Dominion Energy
Size of Main: 6"
Main Distance: On Site
Water
Supplier: City of Columbia
Size of Main: 12"
Water Main Distance to Property: 0.33 miles
Treatment Capacity: 159.5 MGD
Average Demand: 60 MGD
Wastewater
Supplier: City of Columbia
Size of Main: 12"
Wastewater Main Distance to Property: 0.12 miles
Treatment Capacity: 68 MGD
Average Demand: 40 MGD
Force or Gravity: Gravity
Telecom
Provider: AT&T
Service Description: Fiber and Cable Available
Fire Protection
Supplier: Columbia/Richland Fire Service